Point along center line of constrction area (7000.000*30.000)m2..the constrction elevation at 0.00 distance is 55.00 longitude slope is 1:200 downward and side slope 1:1COMPUTE earth work volume
Distance 0. 100. 200. 300 .400 500. 600. 700 800 900 10000
elev. Ground
52.500. 53.400. 54.800. 56.900. 58.00. 56.200. 53.400. 52.400
المطلوب construction ele
Hi cut and fii
A m2. Cut and fill
Volume. Cut and fill
Point along center line of constrction area (7000.000*30.000)m2..the constrction elevation at 0.00 distance is 55.00 longitude slope is 1:200 downward and side slope 1:1COMPUTE earth work volume
Distance 0. 100. 200. 300 .400 500. 600. 700 800 900 10000
elev. Ground
52.500. 53.400. 54.800. 56.900. 58.00. 56.200. 53.400. 52.400
المطلوب construction ele
Hi cut and fii
A m2. Cut and fill
Volume. Cut and fill